Written by
Prabin Kumar Yadav
Senior Advisor
I. Introduction and Legal Basis
On the Nepalese electricity sector, the Electricity Regulatory Commission (“ERC” or “the Commission”) of Nepal has prepared the Draft Open Access Directive, 2082 (2025 A.D.) (“the Directive”), a subsidiary regulatory instrument governing third-party access to the national transmission and distribution networks.[1] The Directive was prepared in line with the General Network Access Framework issued by the Ministry of Energy, Water Resources, and Irrigation (“MoEWRI”), and formally cites Chapter 5, Section 5.1.1 of that Framework as its enabling basis.[2]
The Commission has exercised its rule-making authority under Sections 14(e), 14(j) and 43 of the Electricity Regulatory Commission Act, 2074 (2017 A.D.)[3], and has styled the instrument the “Electricity Regulatory Commission (Open Access) Directives, 2082 (2025 A.D.).”[4] As of the date of this note, the Directive remains in draft form; it will take legal effect only from a date subsequently notified by the Commission.[5] Fairmont Law firm in Nepal.
II. Scope of Application
The Directive applies to Open Access requests concerning the Transmission System (66 kV and above) and the Distribution System (at the 33 kV grid-substation level), subject to the eligibility thresholds set out in Directive 4.1(c) and any further rules or guidelines the Government of Nepal may issue.[6]
III. Eligibility Criteria
The Directive restricts eligibility to apply for Open Access to five defined classes of entity:
● Licensed generating companies operating, or intending to operate, a plant of installed capacity of 5 MW or above, connected at 66 kV or above (transmission) or at the 33 kV grid-substation level (distribution);
● Captive Power Plants (“CPPs”) with a minimum open access requirement of 1 MW at 11 kV and above;
● Industrial or commercial consumers with a Contract Demand of 5 MW or above, connected at 33 kV and above;
● Distribution licensees; and
● Trading licensees.[7]
The Directive fixes the minimum quantum for any Open Access transaction at 1 MW, and, for Cross Border Electricity Trade (“CBET”), at 10 MW.[8]
Cross-border export is permitted only where domestic generation is projected to exceed national demand, subject to exceptions for export-licensed plants, exports by the Nepal Electricity Authority (“NEA”), and exports justified on grounds of national interest; the converse test applies to imports.[9] Approval authority for CBET rests with the Government of Nepal, a body it designates, or the Commission.[10]
IV. Categorisation of Open Access
The Directive divides Open Access into three duration-based categories:
|
Category |
Statutory Duration |
Source |
|
Long-Term Open Access (LTOA) |
Exceeding 5 years, up to the PPA
period |
Cl. 5.1(a) |
|
Medium-Term Open Access (MTOA) |
Exceeding 1 year, up to 5 years |
Cl. 5.1(b) |
|
Short-Term Open Access (STOA) |
Up to 1 year (minimum 24 hours) |
Cl. 5.1(c) |
See generally Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 5.1.
V. Institutional Administration: The Nodal Agency
The Directive designates the Power System Operation Department (“PSOD”) of the Nepal Electricity Authority as the Nodal Agency responsible for receiving, processing, granting, and settling Open Access transactions across all categories, subject to the Government of Nepal's reserved power to redesignate this function.[11]
VI. Allotment Priority and Curtailment
Priority for the grant of Open Access follows a fixed hierarchy: LTOA applicants rank highest, followed by MTOA and then STOA applicants; within each category, allocation proceeds on a first-come-first-served basis.[12] A distribution licensee applying for Open Access to serve consumers within its own distribution area is accorded the highest overall priority.[13]
Where transmission or distribution constraints require curtailment of already-approved capacity, STOA customers are curtailed first, followed by MTOA and then LTOA customers, with curtailment applied pro-rata within each category and a corresponding proportional reduction in transmission and wheeling charges.[14] Curtailment instructions issued by the Load Despatch Centre (“LDC”) take effect after two 15-minute time blocks, save in emergent situations, and are not open to challenge as to their rationality, although an aggrieved customer may approach the Commission's Grievance Redressal Committee.[15]
VII. Metering and Communication Requirements
The Directive imposes detailed metering obligations on Open Access customers, summarized below:
● Main and check meters must be installed at every point of injection and drawal, tested in the presence of the customer;
● Meters must be of smart type, capable of storing 15-minute or 5-minute time-block data for at least 45 days, and able to communicate with the LDC in real time;
● Main and check meters must be jointly sealed by the licensee and the customer;
● Meter and replacement costs are generally borne by the Open Access customer or the licensee, as allocated in the connectivity agreement;
● Readings are taken monthly and must be forwarded by the licensee to the Nodal Agency and other stakeholders within 48 hours; and
● Customers must maintain a round-the-clock control room for communication with the LDC.[16]
VIII. Application Procedures by Category
A. Long-Term Open Access (LTOA)
Applications are filed with the Nodal Agency, with copies to the relevant transmission or distribution licensee, and must be accompanied by a non-refundable application fee — pending prescription by the Commission, fixed at NPR 50,000 for capacity up to 5 MW and NPR 100,000 for capacity above 5 MW, plus applicable taxes.[17] The Nodal Agency must acknowledge receipt within 24 hours.[18] A final decision to grant or refuse LTOA must be conveyed within 60 days of the initial application where no system augmentation is required, or within 180 days where augmentation is required.[19]
B. Medium-Term Open Access (MTOA)
The prescribed application fee, pending the Commission's determination, is NPR 25,000 for capacity up to 5 MW and NPR 50,000 for capacity above 5 MW, plus applicable taxes.[20] MTOA is granted only where the resultant power flow can be accommodated within the existing or under-construction transmission or distribution system, as no system augmentation is contemplated for MTOA grants.[21] The Nodal Agency must convey its decision within 30 days of receipt of the application.[22]
C. Short-Term Open Access (STOA)
The prescribed application fee, pending the Commission's determination, is NPR 5,000 plus applicable taxes.[23] Processing timelines are tied to the duration of access sought:
|
Duration Requested |
Maximum Processing Time |
|
Up to one (1) day |
24 hours |
|
Up to one (1) week |
2 working days |
|
Up to one (1) month |
7 working days |
|
More than one month, up to one
year |
10 working days |
Source: Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 13.2.
IX. Flexibility to Change Injection and Drawal Points
LTOA and MTOA customers may change injection or drawal points twice a year, subject to a system impact study conducted by the relevant licensee at the customer's cost and expense; STOA customers may not alter approved points.[24]
X. Relinquishment and Under-Utilisation of Capacity
The Directive prescribes distinct relinquishment rights by category:
● STOA customers may not relinquish granted capacity and remain liable for full transmission and distribution charges on the originally reserved quantum;
● MTOA customers may relinquish, in whole or in part, on 30 days' prior notice, upon upfront payment of charges for 30 days or the relinquishment period, whichever is lower; and
● LTOA customers may relinquish on one year's notice, upon upfront payment of 66% of transmission and/or wheeling charges for the relinquished quantum over the relinquishment period.[25]
Consistent under-utilisation may result in a 15-day notice from the Nodal Agency requiring explanation, and transfer of unutilised capacity to a third party is prohibited except upon a bona fide change of ownership.[26]
XI. The Open Access Agreement
Every approved Open Access customer must execute a bipartite, tripartite, or multi-party agreement with the relevant licensee(s), covering, among other matters, the points of injection and drawal, the quantum and duration of access, back-up power arrangements, the mode and security of payment, metering and settlement methodology, and compliance with the Grid Code.[27] No Open Access transaction may proceed without execution of this agreement.[28]
XII. Open Access Charges
The Directive establishes nine distinct charge heads applicable to Open Access customers, summarized in the table below.
|
Charge |
Basis / Rate |
Source |
|
Transmission Charges |
NPR/MW/month (LTOA/MTOA) or
NPR/kWh (STOA); derived from the transmission licensee's approved ARR and
projected peak load |
Cl. 18.1 |
|
Wheeling (Distribution) Charges |
NPR/kWh; net admissible fixed
charges over total energy wheeled |
Cl. 18.2 |
|
Deviation Settlement Charges |
To be governed by a separate
Deviation Settlement Mechanism Directive |
Cl. 18.3 |
|
Cross-Subsidy Surcharge |
Tariff less Average Cost of
Supply (ACS); capped at 20% of ACS; nil if negative |
Cl. 18.4 |
|
Additional Surcharge |
Formula-based recovery of the
distribution licensee's fixed supply-obligation costs |
Cl. 18.5 |
|
Stand-By Charges |
125% of applicable tariff for
the first two years of implementation |
Cl. 18.6 |
|
Scheduling Charges |
NPR 500/day for the first two
years |
Cl. 18.7 |
|
Reactive Energy Charges |
Waived for the first two years
of implementation |
Cl. 18.8 |
|
Operation Charges |
NPR 50/MW/day for the first two
years |
Cl. 18.9 |
Source: Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 18.1–18.9.
Captive Power Plants drawing power for their own load are exempted from the Cross-Subsidy Surcharge and the Additional Surcharge, subject to conclusive proof of CPP status as at the date of application.[29]
XIII. Payment Terms and Security Mechanism
Bills must be settled within 10 days of issuance.[30] LTOA and MTOA customers must furnish an irrevocable letter of credit or bank guarantee covering three months of estimated charges, while STOA customers must make upfront payment of all charges (other than deviation settlement charges) for the full duration of access.[31] A late payment surcharge of 1.25% per month, or part thereof, applies, and outstanding dues disqualify an applicant from receiving further Open Access.[32]
XIV. Dispute Resolution
Grievances and disputes are directed in the first instance to a Grievance Redressal Committee established by the Commission. Disputes concerning the interpretation of the Directive itself, or a related Directive, fall outside the Committee's remit and must instead be raised by petition directly before the Commission.[33]
XV. Implementation Timeline
The Directive sets the following principal deadlines, generally running from the date of its issuance or publication:
● Detailed Procedures and Open Access Agreement formats — within 120 days;
● Constitution of the Grievance Redressal Committee — within 120 days;
● Balancing and Settlement Directive — within 120 days;
● Deviation Settlement Mechanism Directive — within 120 days;
● Metering specification Directive — within 120 days;
● Grid connectivity Directive — within 120 days; and
● Installation of interface meters by transmission and distribution licensees — within 180 days.[34]
XVI. Concluding Observations
As a draft instrument, the Directive is not yet in force and remains subject to revision before the Commission formally notifies its commencement date.[35] Nonetheless, its current text establishes a comprehensive framework materially affecting generating companies, captive power plants, large industrial and commercial consumers, distribution and trading licensees, and cross-border electricity traders operating in, or seeking access to, Nepal's transmission and distribution systems. Entities with an interest in Open Access should monitor the Commission's subsequent notifications, including the Detailed Procedures and subsidiary Directives referenced in Section XV above, as these will materially affect implementation
[1]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), at 1 (title page).
[2]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 1.3.
[3]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), preamble & cl. 1.2.
[4]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 1.1.
[5]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 1.4.
[6]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 3.
[7]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 4.1(a)–(e).
[8]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 4.1 (proviso) & cl. 4.2(v).
[9]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 4.2(i)–(iii).
[10]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 4.2(ii).
[11]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 6.
[12]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 7.1–7.2.
[13]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 7.3.1 (proviso).
[14]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 9.1.
[15]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 9.2.
[16]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 8(i)–(xii).
[17]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 11.2–11.3.
[18]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 11.4.
[19]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 11.8.
[20]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 12.2.
[21]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 12.6.
[22]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 12.9.
[23]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 13.1.
[24]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 14.1–14.2.
[25]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 15.4–15.6.
[26]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 15.2–15.3, 15.7.
[27]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 16(i)–(xiv).
[28]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 16 (concluding para.); cl. 7.3.2.
[29]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 18.4 (proviso); cl. 18.5; cl. 19.
[30]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 22.2.
[31]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 23.1–23.2.
[32]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 23.4, 23.6.
[33]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 26.1–26.2.
[34]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 27.1–27.8.
[35]Electricity Regulatory Commission of Nepal, Draft Open Access Directive, 2082 (2025 A.D.) (June 2025), cl. 1.4.